LRQA Hong Kong - measure the differenceLRQA Hong Kong - measure the difference


Directives

Pressure Equipment Directive - PED

PED 97/23/EC

Pressure Equipment Directive - PED 97/23/EC

Description

EC Directive conformity assessment and certification against Directive 97/23/EC on Pressure Equipment. Conformity routes cover quality assurance, design appraisal and direct inspection for pressure equipment. Services that can be provided include material approval, design examination, quality system approval, approval of tests on prototypes and approval of joining procedures and personnel.

Assessment criteria and guidance

Directive 97/23/EC on Pressure Equipment
UK Statutory Instrument 1999 No. 2001, The Pressure Equipment Regulations 1999
ISO 9001:2000
BERR guidance document on the UK Pressure Equipment Regulations
Associated product specific documents  
 
PV


Accreditation / other recognition

Lloyd's Register Verification Limited is designated as a Notified Body in the UK by the Department of Business Enterprise and Regulatory Reform (BERR) for all conformity assessment routes under the Directive. In addition Lloyd's Register Verification Limited is a Recognised Third Party Organisation for non-destructive examination operator qualifications, permanent joining procedure qualifications and permanent joining operator qualifications.

UKAS carries out the assessment and monitoring of Notified Bodies on behalf of BERR.

Useful Link:

http://www.berr.gov.uk/administration/page13625.html  

Next steps...

Choose one of the actions below.